The first MG11 L is leaving our factory and heading to Asia. A newly integrated measuring system was added to the 36.5 tons machine as a further development of the…
It’s a wrap!https://www.linsinger.com/wp-content/uploads/2021/06/Collage_Auslieferung_Malaysia2-1024x698.jpg1024698Linsinger MaschinenbauLinsinger Maschinenbau//www.linsinger.com/wp-content/uploads/2018/01/LS_Logo_white.png
The most versatile rail milling train in the world, the LINSINGER SF02T-FS, is on its way to Asia. It’s always a spectacle witnessing our trains being loaded for transport, they’re…