Infrastructure does not fail out of the blue. It wears out over time as a result of continuous physical processes.
In rail systems, wear, material fatigue and geometric changes occur long before they become apparent during operation.
That is why Linsinger invented the rail milling technology – not as a reactive repair method, but as a controlled process for actively maintaining specified rail conditions.